
Tile Leveling System Mold Last Trial Before Delivery.
During the final trial test of the tile leveling system mold before shipment, the following key steps must be strictly followed to ensure mold quality and production stability:
Pre-Trial Preparation
-
Mold Inspection
-
Verify that the mold has no damage from transportation or assembly (e.g., wear, deformation, rust), focusing on critical parts such as locating pins, ejector pins, and runners.
-
Cross-check mold dimensions (especially key tolerances like clip spacing and thickness) against design drawings.
-
-
Machine Setup
-
Calibrate injection molding/pressing machine parameters (pressure, temperature, cycle time) to match mold specifications.
-
Material preparation: Use the same raw materials (e.g., PP/ABS) as in mass production to avoid deviations.
-
Last trial video of tile leveler mold:



